AI-to-Production Readiness Assessment

One pilot is close to going live, and someone has to say whether it can. This AI-to-production readiness assessment is for the person who has to say.

Built by XONIK. Your answers stay in your browser.

Line drawing for an AI-to-production readiness assessment: a bridge between river banks, with one span of it missing.

In brief

This free AI-to-production readiness assessment shows whether your AI pilot is ready to go live. It looks at one named pilot and the thing likeliest to stall its hand-off. Your answers about ownership, data, approvals, process and operations give a readiness band, plus next-week steps for your weakest areas. Use it for one pilot at a time.

Step 1 of 5: Ownership

0 of 15 answered

  1. Ownership (current step)
  2. Data (not yet reached)
  3. Approvals (not yet reached)
  4. Process (not yet reached)
  5. Operations (not yet reached)

Ownership

Ownership is who receives the system from the project team, answers for it afterward and can change or stop it. A hand-off needs someone on the other end, and a pilot with no one to receive it stays a pilot.

1. Who answers for this system on the day after the project team is released?
2. How far has that owner shaped the design of the live system?
3. Who can switch the system off, and has it been tried?

Data

Data is whether the live system will be fed from a source that someone owns and keeps supplying, in a form the system can use. A pilot that ran on a prepared extract hasn't yet shown it can run on the data it will meet every day.

4. Does the pilot run on the same live source of data that production will use?
5. Who owns the source of the data, and have they agreed to supply it continuously?
6. What happens to the output when the data feeding it is late, wrong or missing?

Approvals

Approvals are the sign-offs that the security, privacy and risk functions must give before a system goes live. Sought late, they set the date of go-live, whatever the project plan says.

7. Have the people who answer for security, privacy and risk seen the design of the live system, not only the pilot?
8. Is it written down which approvals are still needed, and who gives each?
9. Does the live design answer the questions a reviewer will ask: where the data goes, what is logged, who sees the output, and how a person overrides it?

Process

Process is the work around the system: who acts on its output, who handles the cases it can't, and which old route stops being used. A system that sits beside the old process adds a step to it and is easy to ignore.

10. Has the working process around the system been redrawn for production?
11. Is there a day on which the old manual route stops?
12. Who has used the output apart from the volunteers who joined the pilot?

Operations

Operations is what keeps the system working after launch: a fallback, a way to see it drifting and a team that can fix it. The pilot team watched it by hand, and a live system needs that attention built into someone's routine.

13. What happens when the system is down, or gives a wrong answer?
14. How will the owner know that the system is still working well some months after launch?
15. Who can fix the system once the builders are no longer on call?

Answer the 3 questions left on this step to go on.

On this page

What are you asking when you ask whether an AI pilot is ready for production?

This assessment is about a single named pilot: the one with a launch date, a project team about to disband and an executive asking whether it's good to go. It asks whether ownership, data, approvals, process and operations have been settled for this system, and names the weakest pair.

It doesn't test the model, the data or the approvals, and it isn't a reading of the whole organization, which the readiness assessment for a first initiative covers.

A pattern we get called into

A pilot that aced its demo and stalled at the hand-off

A team has run a pilot for one function with a group of willing volunteers. The demo went well and the sponsor has promised a launch date. Everyone calls the pilot ready because it works.

  1. The security review opens. The reviewers see the live design for the first time. Where does the data go, what is logged, how does a person override an output? None of it is built.
  2. The data feed turns out to be an extract. Somebody has been cleaning a file by hand every week, and the team that owns the source has never been asked to supply it daily.
  3. The project team is released. The date holds. The person meant to own the system came to meetings, but has no budget and no authority to change anything.
  4. Users outside the volunteers start. They don't trust the output, so they keep the old process running beside it.

Where it endsThe system runs, then drifts. Eventually someone finds that the output has been wrong for a while, and nobody can say whose job it was to notice.

Who should answer, and why not leave it to one person?

Have the pilot's owner and its project lead answer on their own, then compare. The lead knows what has been built, and the owner knows what they've agreed to take on. The gaps between their answers are often the most useful result. If no owner has been named yet, that's the first finding.

Answer for one pilot at a time, and choose the card you could back with a document or a demonstration, not the one that's planned.

Is this the assessment for your pilot?

Use it when

  • One specific pilot is close to going live and someone has to say whether it can
  • A launch date has been promised and you want to know what's likeliest to move it

Look elsewhere when

  • You need the model's accuracy tested, or its use checked against the law where you operate
  • You want a view across a group of pilots at once, since the answers average out

The trade is focus against reach. One pilot gives you a result you can act on, and every other pilot waits until you run it again.

What does an AI-to-production readiness band say about your launch date?

The bands speak to the hand-off, not to the quality of the pilot. A pilot can be impressive and still sit in Not ready, because impressive describes the demonstration and ready describes everything around it. Ready to hand off means the arrangements exist; it doesn't say the launch will go well. The weakest areas, picked by their share of points, come with steps written for the week after the result.

What should you do first after a low result?

  1. 01

    Put names against the gaps

    Next to each answer that cost points, write who can close it and by when.

  2. 02

    Book the approvers now

    Send the live design to security, privacy and risk while the build is still under way.

  3. 03

    Settle the data supply in writing

    Ask the owner of the source to commit to the supply and to warn you of changes.

  4. 04

    Set the day the old route stops

    Agree the date with the function head, then announce it.

What do heads of AI and pilot owners ask before they start?

Can I assess all our pilots in one sitting?

No. Answer for one named pilot at a time. Across a group of pilots the answers average out and hide the one in trouble. If you want a view of the whole organization before a first initiative, the enterprise readiness assessment covers that and this one doesn't.

Our pilot works well. Why could it still come out as Not ready?

Because impressive describes the demonstration and ready describes everything around it. The bands speak to the hand-off: owner, live data, approvals, process and operations. A pilot that passed its demo can stall when the security review opens or when the data feed turns out to be a hand-cleaned extract.

Does a high result mean the pilot can launch safely?

No. Ready to hand off means the arrangements exist, not that the launch will go well. Nothing is tested here, neither the system, the data nor the approvals. How accurate the model is, and whether its use is lawful where you operate, need a separate review.

Who should answer for the pilot?

The pilot's owner and its project lead, each on their own, then compare. The lead knows what has been built and the owner knows what they've taken on. Where the answers differ, you've found something worth fixing. If no owner has been named, that is your first finding.

Is your go-live date ahead of your hand-off arrangements?

Tell us which pilot it is, what date has been promised and which gap worries you. A senior person reads it and replies with what we would settle first.