Technology Evaluation: choose with the criteria fixed first
Your teams each favor a different vendor, and finance will ask how you chose. A technology evaluation with us starts before anyone demos: we fix the criteria with the people who'll rely on the choice, then test every candidate on your own scenarios.

In brief
Technology evaluation helps you choose between technologies, vendors or approaches on criteria fixed and dated before any vendor demonstrates anything. We shortlist on evidence, run every candidate through your own scenarios, review contract, cost and exit risk, and recommend with our reasoning and what would change the answer.
On this page
Why does the favorite usually win before a technology evaluation starts?
Selections tend to open with demos and a feature list. The vendors that present best set the terms of the comparison, and the weights get assigned afterward, once a favorite has emerged. Whatever the final score says, it was shaped by an answer somebody already wanted, and a sharp finance partner or an auditor will see that in a minute.
The questions that decide the outcome are rarely on the list. What does the product do with your untidy data? What does it cost to run once the introductory terms end? How does your data leave if you leave? Which team has to change how it works? Those surface in the second year, when the choice can't be undone cheaply. A selection can be defended on the day and still be wrong, because the evidence it rested on was the vendor's.
Criteria weighted after the demos measure the favorite.
So we agree and date the weights before any vendor is contacted.
Whose question is the choice answering?
A choice that's contested inside the company is usually a bundle of separate choices under one name. Each person who'll rely on it is asking something different, and the criteria have to make room for every question that could later be used to reopen the decision.
| Who relies on the choice | What they'll ask later | What the criteria and proof must already show |
|---|---|---|
| Security lead | Where does data go, who can see it, and what happens in a breach on the vendor's side? | A must-have criterion on data handling, tested against your classification rules rather than the vendor's summary |
| Finance partner | What does it cost in the year after the introductory terms, and what does leaving cost? | A running-cost model with stated assumptions, and a costed exit |
| Head of operations | Who gets paged, who retrains, and what slows down during cutover? | Scenarios written by the people who do the work, and scored by them |
| Product owner or sponsor | Does it do the job that justified the budget? | A proof on that job, including the cases a demo skips |
| General counsel's office | Can we get out, and who owns what gets produced inside it? | Contract, data portability and ownership terms read against the criteria |
The order of work decides the answer
- 01
Criteria
Agreed with the people above, weighted and dated.
- 02
Shortlist
Candidates that fail a must-have drop out, and the reason is recorded.
- 03
Proof
The same scenarios, drawn from your work, for every candidate.
- 04
Risk and cost
Contract terms, exit path and running cost, all costed.
- 05
Recommendation
A memo that says what would change the answer.
How do we set up a proof on your own scenarios?
The scenarios come from the head of operations or the product owner and are drawn from real work: a typical case, a hard case, and the case that went wrong last quarter. We write them down before any vendor sees them, and every candidate gets the same set. We run the proof in an environment we control, or in yours, so no candidate can tune the setup for itself.
The people who'll use the choice score the results, with the vendor's name hidden where the interface allows. If a vendor declines the proof conditions, the report records that, and the decline counts against it. The cost to you is time: someone in operations has to write scenarios and score them, and the security lead has to approve what data the proof touches.
At the end you have a scored set of results for each candidate, the scenarios themselves, and a note of every moment where a candidate needed its own staff to finish a task.
A composite example
A retail group, divided camps and one platform decision
A CIO at a retail group has to choose a commerce and promotions platform. The engineering lead favors a flexible platform the team assembles. Merchandising favors a packaged suite that runs the promotions calendar out of the box. Each camp has a vendor on its side, and both have already seen their favorite demonstrated.
Invented for illustration from recurring patterns. No client is behind it.
- The criteria session moves the argument. Instead of debating products, the camps argue about weights, such as how quickly a merchandiser can change a promotion rule without a developer. That argument gets settled and dated.
- The shortlist loses a candidate. One product fails a must-have on data residency, and the reason is written down.
- The proof uses last season's hardest week. Both remaining candidates work through the same promotion changes, scored by merchandisers and by the engineering lead.
- The risk review finds the exit problem. The packaged suite exports data only in a format that needs rework, and its running cost after the introductory terms is well above the figure in the proposal.
Where it endsThe recommendation names the flexible platform, with conditions on merchandiser tooling and a note on what would reverse it. Merchandising doesn't get its favorite, yet signs the memo as a fair statement of the criteria it helped set.
Technology evaluation, a pilot, or renewing what you have
A formal evaluation takes time from your senior people. It's worth it when a wrong choice is hard to reverse.
An evaluation fits when
- More than one candidate is credible and the choice is contested inside the company
- Leaving later would be expensive, because of data, retraining or dependent systems
- Finance, security or an auditor will ask how the choice was made
- The decision may be build, buy or an agent, and the options can't be compared directly
Something lighter is better when
- A regulation or an existing integration leaves one realistic candidate
- The choice is cheap to reverse, so a short pilot teaches more than a study
- You aren't yet sure the technology works at all. That's Technology Research
- The decision is taken and you want the paperwork to match
An evaluation costs some weeks and puts off the comfort of an early decision. The choice that comes out has a written basis, and each camp helped define it.
What a technology evaluation memo contains
The memo opens with the recommendation and the conditions attached to it. Choosing one product with conditions on configuration and contract is more useful than an unqualified name. Behind it sit the dated criteria record, the scorecard for each candidate, the proof results with the scenarios, the cost model with its assumptions, and the contract review.
A sensitivity note says what would change the answer: usage growing well beyond the proof, a change in the vendor's terms at renewal, or a requirement the criteria didn't anticipate. It tells you when to revisit the choice, and it hands your negotiators the points the risk review found. Your counsel drafts and negotiates; we say which terms to seek and which to refuse.
If we have any relationship with a candidate, we say so before the evaluation begins and step back from that vendor's part of the work.
Where the recommendation stops
A proof shows how a product behaved in the scenarios we ran, under the conditions we set. Daily use is different, and a product that did well in the proof can still meet problems in the first full cycle of real use.
- The people who'll rely on the choice have to agree the criteria, which takes their time.
- Vendors must accept the same proof conditions. If one declines, the report records it.
- We recommend. We don't negotiate or sign for you unless the scope says so.
- We can't promise that the chosen product will perform in daily use as it did in the proof.
The tools this method is built on
The matrix and the proof scorecard are the working instruments for the criteria and proof stages. The perspective below explains why a pilot flatters what production has to pay for.
Questions CTOs and procurement leads raise about a technology evaluation
How do you stay independent of the vendors you evaluate?
We state any relationship with a candidate before the evaluation starts and step back from that vendor's part. The criteria are dated first, every candidate meets the same proof, and the record lets your team check that we followed it.
Can you evaluate approaches as well as products?
Yes. A selection is sometimes really a choice between building, buying and using an agent. The same discipline applies: fixed criteria, a proof on your scenarios, and a written recommendation with its conditions.
What if candidates score the same?
Then the criteria aren't discriminating, and we say so. We look for what separates the candidates in the scenarios and the risk review. If nothing does, we recommend the one that is cheaper to leave, because it is the cheaper one to be wrong about.
Do you help with the contract once we choose?
We give you the points that matter from the risk review: terms to seek, terms to refuse and exit provisions. Your counsel drafts and negotiates. If you want us at the table for the technical questions, we can put that in the scope.
Related
Were your selection criteria fixed before the demonstrations began?
Name the options on the table and who is pulling for each. The reply sets out how we would run the criteria session.