Skip to main content
Discuss Book a call

Free assessment · quick to answer

Technology Risk Assessment: Systems and Architecture

Your systems work today. This technology risk assessment shows where one small event could still turn into a long outage, through the way your systems depend on each other, change and recover.

Built by XONIK. Your answers stay in your browser.

Line drawing for a technology risk assessment: systems linked in a network, with one link cut and no fallback behind it.

In brief

This free technology risk assessment shows where the risk sits in your systems and architecture and what to look at first. You answer questions on dependencies, change, recovery and visibility, then get an exposure band and steps for your weakest areas, each given to a named role, in a PDF you can share. It isn't a security audit.

Step 1 of 4: Dependencies

0 of 16 answered

  1. Dependencies (current step)
  2. Change (not yet reached)
  3. Recovery (not yet reached)
  4. Visibility (not yet reached)

Dependencies

Dependencies are the links between your systems, your suppliers and the platforms underneath them. You can't manage a risk until you know what leans on what, because the weakest link usually shows itself by failing.

1. How up to date is your picture of what each major system relies on, and what relies on it?
2. If an outside supplier failed or changed its terms, which ones would stop the business, and could you say so now?
3. What happens when a library, framework or platform that your systems share stops being supported?
4. Is there a system or integration that would take others down with it if it stopped, and do you know which?

Change

Change covers how work reaches production, how it gets undone and who may touch it. Faults usually enter a running system through a change, so the controls around change decide whether a small mistake stays small.

5. How does a change get into production?
6. When a change goes wrong, how do you undo it?
7. How often does even a small change need a meeting to coordinate it?
8. Who can change production, and how do you know who did?

Recovery

Recovery is whether the business can restore service in a time it can bear, using people and steps that have been tried. A backup or a plan that nobody has exercised is a belief, not a capability.

9. When did you last restore a critical system from backup to prove that it works?
10. Has the business said how long each critical system may be down and how much recent data it may lose?
11. If the person who knows a critical system were unavailable, could someone else run it?
12. What happens if your main cloud region, data center or hosting provider is unavailable?

Visibility

Visibility is how soon you learn that something is failing, and how well the reasons behind your systems are recorded and shown to the business. What can't be seen can't be fixed in time, or argued for at budget time.

13. How do you learn that something is failing?
14. Are architecture decisions, and the reasons for them, written where new engineers can find them?
15. After an incident, what gets written down and what changes?
16. How do leaders outside technology see the state of technology risk?

Answer the 4 questions left on this step to go on.

On this page

What does a technology risk assessment look at, and what can't it check for you?

Where would a small event turn into a large one? A supplier changes its terms. An engineer leaves. A backup turns out not to restore. You can survive any of these if you know your dependencies, can undo a change, have tried recovery and see failures early. The questions take those conditions one at a time and ask what is true today, not what was intended.

It doesn't scan or test anything, so it won't find a vulnerability. A good result doesn't say your systems are safe. It says how much of the control you describe is located, written down and proven.

Who should answer, and how long it takes

The head of engineering or the lead architect can answer much of it alone. The recovery and visibility questions are better known to the people who carry the pager, so bring in an infrastructure lead. If experienced people disagree on an answer, one of them probably knows a control the other has never seen written down.

Do it in one sitting. If you stop to look things up, it drags, so note the question and move on. Those notes become your list of checks.

AreaWhat it asksEvidence that settles it
DependenciesWhat leans on what, inside and outside the businessA current map, a supplier list tied to business functions, a calendar of support end dates
ChangeHow work reaches production and how it gets undoneThe record of your last change, with its way back
RecoveryWhether service comes back in a time the business can bearA timed restore, and a run book that a second person has used
VisibilityHow soon a failure is seen, and by whomYour last incident review, and the risk list that leaders read

How to turn a band into a decision about where to look

Your band names a state and the failure that tends to follow it. A low band is a reason to look, not a finding. Even answers add up to a different situation from a total that hides one area near the bottom, so the result also shows each area's share of its points and picks your weakest pair. Each comes with steps that name who does them and what exists at the end, such as a timed restore record.

Treat your strongest area differently. Ask someone who didn't write the answer to show you the evidence behind it.

Use this technology risk assessment, or commission a deeper review

A self-assessment fits when

  • You need to decide where to look first, before paying for a review
  • Leadership wants a shared picture of technology risk
  • A merger or a supplier switch is coming and you want to see what it would lean on

Commission something else when

  • You need assurance for a regulator, a customer or an insurer, which takes independent testing
  • You're worried about a specific vulnerability or breach, which calls for a security assessment
  • You need a design for a new platform, which calls for an architecture review

The trade is independence for speed. The people who know your systems best answer quickly, and they are also the people least likely to be hard on them.

What to do in the days after you get your result

  1. 01

    Sort the answers

    Mark each answer in your weakest area as known, believed or guessed.

  2. 02

    Take one proof

    Pick the cheapest check in the steps, such as a timed restore of the system you can least do without, and book an engineer for it.

  3. 03

    Show the business

    Send the risk list, with an owner against each item, to the leader who would feel a loss first.

  4. 04

    Answer again

    Retake the assessment once the proof is done. Don't be surprised if an answer drops first and then rises.

What do CTOs and architects ask before they start?

Does this replace a security audit or a penetration test?

No. It scans nothing and tests nothing, so it can't find a vulnerability. What it shows is how much of the control you describe is located, written down and proven. A high band means your answers describe control, not that your systems are safe, so use it to decide what to examine first.

What if I'm not sure our backups and run books really work?

Pick the lower answer and write the doubt down as the first thing to check. The common mistake is answering from the design, such as assuming a backup restores because the job says it succeeded. A timed restore of a critical system is the cheapest way to find out.

Who should answer besides the head of engineering?

Bring in an infrastructure lead, plus whoever carries the pager. The head of engineering or lead architect can cover much of it alone, but recovery and visibility are better known to the people who respond when things break. Where experienced people disagree, one of them probably knows an unwritten control.

What should I do if I land in a low band?

Treat it as a reason to look, not a verdict. The result picks your weakest areas by their share of points and gives steps that name who does them and what exists at the end, such as a timed restore record. Then check your strongest answer too, with someone who didn't write it.

Which outage would your business struggle to absorb?

Tell us which system you'd least want to lose and what you know about bringing it back. A senior person reads it and writes back with how we would check it.