Skip to main content
Discuss Book a call
TemplateXLSX

Proof-of-Concept Evaluation Scorecard

The pilot has finished and people disagree about whether it worked. Write the test before the work starts, and this proof of concept scorecard gives you a verdict and a list of conditions for going live.

Download XLSXVersion 1.0 · Updated October 20, 2026 · 39 KB

Free to use. There is no sign-up in front of it.

Line drawing of a proof of concept scorecard grid, with one empty cell where a criterion has no result.

What is in the proof of concept scorecard workbook

  • Settings: how much credit Yes, Partly and No earn, and the limits at which a weighted result counts as a success or as mixed
  • Scorecard: each criterion with how it is measured, its target, its weight and whether it is a must-have, all filled in before the work starts
  • The result and whether the target was met, recorded for each criterion when the proof of concept ends
  • A weighted result and a verdict, with a rule that a must-have rated No overrides the arithmetic
  • Go-live conditions: an owner, a run on live data, risk sign-off, a redrawn process, a tested fallback and a stop date for the old route, each with its evidence
  • Room to write down what you learned and what changes

When to fill in what

  1. 01

    Fill the first columns before work begins

    Criterion, measure, target, weight and must-have go in first. Save a dated copy so the criteria cannot drift to suit the result.

  2. 02

    Score at the end

    When the proof of concept ends, record each result and mark Yes, Partly or No. Do not score along the way.

  3. 03

    Then work through the conditions

    A success shows the idea works. The conditions ask whether the business can run it.

What the verdict is not

The verdict limits are examples you can change, not a standard. The scorecard judges against your own criteria and cannot tell you whether they were the right ones. Once a proof of concept succeeds, the AI-to-Production Readiness Playbook covers the next stage.

On this page

Score a proof of concept after the fact and the meeting argues, and the loudest reading wins.

So the criteria are written first and kept.

What do people ask before they use the proof of concept scorecard?

When do I fill in each part of the scorecard?

Before the work starts, write each criterion, how it is measured, the target, its weight and whether it is a must-have, then save a dated copy. Record results when the work ends. Writing the criteria first keeps them from drifting to fit the outcome.

What does a good criterion look like?

One you can measure under production conditions. Run the work on live data through the route production will use, set the target at no manual clean-up, and mark it a must-have. A pilot that ran only on a tidy extract has proved the extract.

How does the scorecard reach a verdict?

It gives credit for Yes, Partly or No, weights each criterion, and compares the total with limits you can change. A must-have rated No overrides the arithmetic. One rated Partly does not, so read those rows yourself before accepting a success.

What do I do once the proof of concept succeeds?

Complete the go-live conditions below the scorecard. A success shows the idea works, not that the business can run it. The conditions ask for an owner, a run on live data, risk sign-off, a redrawn process, a tested fallback and a stop date for the old route.

Is the pilot over and the verdict still open?

Tell us what the pilot was meant to show and who is waiting on the answer. A senior person writes back with how we would score it.